Sample Change Order Form
Agree to the scope, the price, and the new schedule in writing before the extra work starts. Collect the change, the revised contract total, the new completion date, and the client's approval in one form.
A change order signed after the work is done isn't an agreement. It's an invoice the client can argue with, because "while you're in there, could you also" needs a price and a signature before anyone picks up a tool. A change order adjusts two things: the contract sum and the contract time. Teams settle the sum and leave the days blank, so the crew still owes the client the original completion date, even after the client added a week of work. Typeform's change order form records the scope, the cost, and the schedule impact together, before the work starts.
With a sample change order form, you describe the change and what it does to the contract: added scope, revised cost, revised dates. Conditional logic reads whether the change adds work, substitutes something, or removes it. Added work opens the labor, the materials, and the days it pushes the schedule. A substitution or a deletion opens the credit and asks whether the original completion date still holds. The client approves before the crew starts.
Each change order sits with the original contract as a dated amendment carrying the revised total and the revised completion date. When the job runs long, you can show which approved changes added the days. The final invoice matches a run of signed approvals instead of a conversation two people remember differently.
A change order form is an online form for documenting a change to an agreed scope of work, along with what it does to the price and the schedule. It collects a description of the change, the revised cost, the days it adds or removes, the reason for it, and the client's approval. Contractors and project managers use change order forms to agree a change in writing before the work starts rather than after it.
Without a change order form, you agree to changes on site and invoice them at the end. The client remembers approving the extra outlet but not the fifteen hundred dollars it added, nobody wrote down why the schedule slipped, and now you're negotiating over a job that's already finished. A change order form puts the price and the new date in front of the client before the work starts, while they can still say no.
Capture what the change affects:
- Description of the change and why
- Revised cost, itemized
- Days added or removed
- Revised completion date
- Client approval and date
Yes. Typeform variables can add the change amount to the original contract sum and show the revised total on the approval screen, so the client sees the figure they're agreeing to instead of a line item they have to add up themselves. Pass the original sum in with a hidden field from your project software, so nobody retypes it and nobody transposes a digit. Do the same with the days: total the extension against the days already approved, and show that number beside the new completion date the client is signing off.
Yes. You can upload photos of the condition that prompted the change with File Upload, available on paid Typeform plans. You can add images or PDFs up to 10MB each, so the rot behind the wall is on record next to the cost of dealing with it. Every photo arrives attached to the change order.
Get inspired by relevant templates and categories
3200+ Templates, 300+ Integrations

Bank Reference Form
A reference request faxed to a bank branch and left sitting in a queue for weeks isn't the kind of turnaround a landlord or business can wait on. Collect the applicant's signed authorization and the specific details you need confirmed before the request even reaches the bank, so a decision isn't stuck behind a letter that hasn't come back yet.
View template

Bar Inventory Form
A bottle count eyeballed at the end of a shift and scrawled on a paper sheet doesn't hold up against a pour cost report that says something doesn't add up. Collect what your bar actually needs, item, count, and variance, on a schedule you can actually compare week to week.
View template

Equipment Inventory Form
Equipment that leaves a storage room in someone's arms, with no note about where it went, doesn't show up again until someone needs it and can't find it. Collect what your team actually needs, item details, condition, and who's got it, every time something moves.
View template

Maintenance Agreement Form
A maintenance plan agreed to over the phone isn't a contract your service team can actually work from, especially when nobody's sure whether the twice-a-year tune-up was part of the deal. Collect the equipment covered, service frequency, and a signed agreement before the first visit, so your team isn't guessing at scope once they're on-site.
View template

Incentive Claim Form
A rebate claim mailed in with a stapled stack of receipts isn't the kind of paperwork that gets processed quickly, especially when a required serial number turns out to be missing from page three. Collect proof of purchase, product details, and participant information upfront, so a claim doesn't bounce back for a missing document weeks later.
View template

Threat Assessment Form
A concerning comment that gets passed from a teacher to a counselor to whoever's free that period loses detail with every retelling. Collect what your team actually needs, what was observed or reported, who was involved, and when, before an important detail gets dropped along the way.
View template
With Typeform, you can 
customize everything
Change text, colors, and even logos to match the look and feel of your brand. Then embed forms smoothly onto web and email.
Make forms feel effortless to fill out. Pace questions, call people by their name, and adapt the flow based on the data they share.
Stay efficient by connecting forms to your workflow. Typeform integrates with 300+ tools including Slack, Zapier, and HubSpot.